Adjust the take-up device so the belt on a pipe belt conveyor keeps enough pre-tension to drive without slip and to hold the pipe closed, then re-check it three times - at commissioning, after one to two weeks of running, and at one month. The number you are chasing is take-up travel, not force: reserve 1–3% of the centre distance, set the device to the supplier's tension figure, and confirm the result by belt sag and by the way the pipe closes.

 

 High Quality Tube Belt Conveyor

 

Key takeaways

• On a pipe belt conveyor, low tension shows up first as an open pipe or a leaking overlap, not as drive slip. Check closure before you add weight.

• Reserve 1–3% of centre distance as usable take-up travel. A device that runs out of stroke mid-life means a belt change, not an adjustment.

• Adjust in small steps and re-measure. A screw take-up on a pipe belt conveyor moves roughly 5–10 mm per turn depending on pitch.

• New belts stretch. Re-tension at one to two weeks and again at one month, then annually.

• Isolate and lock off a pipe belt conveyor before touching any take-up device; release hydraulic pressure before opening a circuit.

Which take-up type is on your pipe belt conveyor?

Type

Travel available

Adjustment

Best fit

Gravity

Large, 1–3% of centres

Add or remove weight

Long, fixed pipe belt conveyor routes

Screw

Short, 300–800 mm

Manual, per turn

Short centres, light duty on a pipe belt conveyor

Hydraulic

Large, controlled

Pressure setting, automatic

Long overland, variable load

What does the take-up device do on a pipe belt conveyor?

Two jobs, and the second is specific to this machine type. The first is to hold pre-tension so the belt does not slip on the drive pulley and so it sags within limits between idlers. The second is to keep the belt closed: a pipe belt conveyor forms its tube by rolling the belt through 90°, and that roll only holds if the belt is tensioned enough to keep the overlap engaged.

That is why tension on a pipe belt conveyor is judged by two symptoms, not one. Drive slip tells you the tension is low at the head. An open pipe, a leaking overlap or material escaping along one side tells you the tension is low along the route - and that can happen even when the drive is not slipping at all.

Which take-up type suits which pipe belt conveyor?

Gravity take-ups are the simplest and the most forgiving: a weighted pulley or trolley moves as the belt stretches, holding tension with almost no attention. They need vertical space and a free-running guide, and on a pipe belt conveyor with a long horizontal route they are usually the first choice; a coal pipe conveyor on a fixed mine-to-plant route almost always gets one.

Screw take-ups are compact and cheap, which makes them common on short pipe belt conveyor installations and on tail-end booster positions. They are manual, so someone has to check them; and because travel is short, they suit belts whose elongation is predictable - a tube belt conveyor in a quarry is a typical case.

Hydraulic take-ups cost more but hold tension automatically and can be programmed to follow load. On a long pipe belt conveyor with varying tonnage, that keeps the pipe closed at low load without over-tensioning at peak, and a tubular belt conveyor carrying hot material benefits from the same automatic compensation.

How do you adjust a gravity take-up on a pipe belt conveyor?

Start by confirming the weight is actually free on the pipe belt conveyor. A gravity take-up that has seized, or whose guide rails have picked up dirt, behaves like a fixed take-up and gives false tension readings. Check that the trolley moves, that the rope or chain is intact, and that nothing is fouling the travel path.

Then measure before you change anything on the pipe belt conveyor. Record the take-up position against its scale, measure belt sag at a reference span, and note whether the pipe is fully closed at the last forming station of the pipe belt conveyor. Add or remove weight in increments, run the machine for ten minutes under load, and repeat the three measurements.

Add weight to the pipe belt conveyor only until the pipe closes cleanly and the sag is within 1–2% of the span. Beyond that point you are adding bearing load and belt stress for no benefit.

How do you adjust a screw take-up on a pipe belt conveyor?

Clean and lubricate the screw of the pipe belt conveyor first; a dry screw tells you nothing about tension because the torque you feel is friction, not load. Mark the initial position on both sides, then turn each side equally - a screw take-up adjusted on one side only will skew the pulley and push the pipe belt conveyor off centre.

Turn in small increments and re-measure. Most screw take-ups move 5–10 mm per turn, so a 30 mm correction is three to six turns per side, not a quarter turn and hope. Finish by re-checking pulley squareness against the frame of the pipe belt conveyor; if the pulley is out of square, the belt will migrate regardless of tension.

How do you adjust a hydraulic take-up on a pipe belt conveyor?

Check the fluid level on the pipe belt conveyor and look for weeps before touching the pressure setting. Air in the circuit is the usual reason a hydraulic take-up feels spongy or drifts; bleed it before you chase the gauge. Confirm the accumulator is charged to its pre-charge value, and check that the rod is not scored.

Set pressure to the figure on the supplier's tension schedule for that pipe belt conveyor, not to the maximum the pump can produce. On an automatic pipe belt conveyor, the controller usually holds tension by pressure band; widen the band only if the pump is cycling constantly, and never beyond the belt supplier's limit.

How much take-up travel does a pipe belt conveyor need?

Reserve 1–3% of the centre distance. A 1,000 m pipe belt conveyor therefore needs 10–30 m of usable travel if the belt is expected to elongate across its life, which is why gravity and hydraulic take-ups dominate on long routes and screw take-ups do not.

Check the reserve at commissioning of the pipe belt conveyor, not at the first failure. If the device is already at 70% of its stroke when the belt is new, the installation cannot absorb normal elongation and the belt will need shortening or replacing earlier than planned.

What goes wrong on a pipe belt conveyor, and how do you fix it?

Symptom

Likely cause

Action

Belt slips on the drive pulley

Tension below schedule

Increase to schedule; check lagging

Pipe will not close, overlap leaks

Low tension along the route

Raise tension; check forming idlers

Pipe rotates, overlap drifts

Uneven tension across the belt

Check pulley squareness and both screws

Take-up at end of stroke

Insufficient reserve or excessive stretch

Shorten belt; review take-up sizing

Screw will not turn

Dry thread, corrosion, debris

Clean, lubricate, free the carriage

Hydraulic pressure drifts

Air in circuit or leaking seal

Bleed, replace seals, re-set pressure

What should the commissioning checklist for a pipe belt conveyor cover?

• Isolate and lock off the drive of the pipe belt conveyor before any adjustment; release hydraulic pressure before opening a circuit.

• Record the initial take-up position and the date; photograph the scale.

• Confirm guards are refitted and the pull-cord is reset before restart.

• Run the pipe belt conveyor empty, then loaded, and record sag and pipe closure at both states.

• Re-tension at one to two weeks and again at one month, then annually.

• Log every adjustment on the pipe belt conveyor so the next technician knows the trend, not just the position.

Tube Belt Conveyor Design

What does this mean for your take-up?

Adjusting a take-up device on a pipe belt conveyor is a measurement task, not a feel task. Record the position, measure sag and pipe closure, change one variable at a time, and re-measure. On a pipe belt conveyor the reward is a tube that stays closed and a belt that reaches its design life.

If you are specifying a new pipe belt conveyor, size the take-up for 1–3% of centre distance and state the tension schedule in the contract. If you are operating one, put the three re-tension points in the maintenance plan now - the cost of a take-up that runs out of stroke is a belt, not an adjustment.

We supply Pipe Belt Conveyor systems with gravity, screw or hydraulic take-up, and the same hardware is used across our Coal Pipe Conveyor, Tubular Belt Conveyor and Tube Belt Conveyor ranges. Tell us the centre distance, belt type and expected elongation, and we will size the take-up and hand over the tension schedule with the drawings.

References

  • Conveyor Belt Handbook, various editions
  • Manufacturer's manuals for pipe belt conveyors
Send Inquiry
Contact us if have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!